Projeto Integrador

Projeto Integrador

domingo, 6 de dezembro de 2015

Weekly Update - Filings, Reviews and Progresses

Hello, Blog readers!

Today, we'll mention about our progress during the Integrator Project's eighth week.

As time for the final presentation gets thin, time urges for the rivet creation conclusion. With selected steel for the mould in the team's hands, the Solarium Engineering Team waits for its turn in the lab usage, scheduled for this monday. The objective of this scheduling is create the holes that will compose the brass casting structure. Therefore, as computated before, the holes shall posess the needed dimensions for the planned rivet result.

Picture 1. First report review.
Source: own.

In addition to that, awaiting the deadline, the first report was submitted to review. The objective os to verify information errors, wrong calculus or disparate info, changed during the Project. Therefore, there shall not be incoherences related to the Project itself.
For the first report review, the volumetric contraption of the analysed material was modified. The brass contraction was incorrectly calculated by the Team, therefore generating a different result.

Meanwhile, the Team gathered with the advisor teacher Mauricio Camargo with an administrative disposition. The objective is to verify (and repair) pendencies for the Project: what's left to do, who needs to do what, and a Work Plan coherence review.

Picture 2. Meeting with advisor teacher Mauricio Camargo (extreme right). From left to right: Lucas Naves, Gustavo Silva, Carlos Cailan, Gabriel Dantas.
Source: own.
As the week advances, we were charged to collect 5 scientific articles in English to create a filling.

Picture 3. Screen capture of  Flash presentation about fillings (fichamentos) in Portuguese.
Source: VIRIATO, S. Resumo, Resenha e Fichamento: Definição e Diferenças. Ministério da Educação, 2015. Available at: <objetoseducacionais2.mec.gov.br/bitstream/handle/mec/16228/?sequence=10#introducao>. Accessed at: 27 nov. 2015. Collaborators: Cespe/UnB (AFONSO, Maria da Conceição (Coord.); JACOB, Aline; EIRÃO, Thiago G.; ANDRADE, Faura; GOULART, Ana).

For this week, that was all the advancement. Next week we will bring more information about the rivet creation! It will be the definitive week!
We appreciate the attention!

Best regards,
Solarium Engineering Team

Nenhum comentário:

Postar um comentário