Today, we'll mention about our progress during the Integrator Project's eighth week.
As time for the final presentation gets thin, time urges for the rivet creation conclusion. With selected steel for the mould in the team's hands, the Solarium Engineering Team waits for its turn in the lab usage, scheduled for this monday. The objective of this scheduling is create the holes that will compose the brass casting structure. Therefore, as computated before, the holes shall posess the needed dimensions for the planned rivet result.
![]() | |
Picture 1. First report review. Source: own. |
For the first report review, the volumetric contraption of the analysed material was modified. The brass contraction was incorrectly calculated by the Team, therefore generating a different result.
Meanwhile, the Team gathered with the advisor teacher Mauricio Camargo with an administrative disposition. The objective is to verify (and repair) pendencies for the Project: what's left to do, who needs to do what, and a Work Plan coherence review.
![]() |
Picture 2. Meeting with advisor teacher Mauricio Camargo (extreme right). From left to right: Lucas Naves, Gustavo Silva, Carlos Cailan, Gabriel Dantas. Source: own. |
We appreciate the attention!
Best regards,
Solarium Engineering Team